Template:Final Audit Report: Difference between revisions
From Future Worlds Center Wiki
Jump to navigationJump to search
(Created page with "{| border="0" width="285" style="margin:5px 0px 5px 10px;float:right;clear:right;border:1px solid #ccc;background-color:#E5E5E5;line-height:1.5em;word-spacing:0.5px;" | {{Person...") |
(No difference)
|
Revision as of 05:26, 25 May 2015
|
EXAMPLE ON HOW TO USE THE TEMPLATE
Copy and paste the code below to the page you wish to add an Associate's box such as this one:
{{Final Audit Report |acronym=write the project's acronym |logo=moblang.jpg |contract_title=link this encyclopedic page with the formal contract (write the project's contract title) |contract_number=xxxxxx |auditor=write the Auditor name |audit_period=write the audit period of the project |dates_fieldword=write the dates of fieldword |total_reported_costs=write the total reported cost of the contract |fwc_reported_cost=write the FWC reported cost of the contract |total_ineligible_expenditure=write the total ineligible expenditure of the contract |fwc_ineligible_expenditure=write the FWC ineligible expenditure of the contract }}
Then replace the content of the variables with your own, for example :
Replace
acronym=write the contract acronym
With
acronym=Moblang
List of Variables
- acronym : This variable expects from the editor to assign to it the acronym of the Project Contract
- logo : This variable expects from the editor to assign to it the logo image of the Project Contract. You must first upload an image using the upload file option of the toolbox available on the left column of the page. This option is visible if and only if you are logged in.
- contract_title : This variable expects from the editor to link this encyclopedic page with the formal project contract title.
- contract_number : This variable expects from the editor to assign to it the contract number for the Project
- auditor : This variable expects from the editor to assign to it the Auditor of the Project Contract
- audit_period : This variable expects from the editor to assign to it the audit period
- dates_fieldword : This variable expects from the editor to assign to it the dates fieldword of the Project Contract
- total_reported_costs : This variable expects from the editor to assign to it the total reported costs of the Project Contract
- fwc_reported_cost : This variable expects from the editor to assign to it the fwc reported cost in the Project Contract
- total_ineligible_expenditure : This variable expects from the editor to assign to it the total ineligible expenditure of the Project Contract
- fwc_ineligible_expenditure : This variable expects from the editor to assign to it the FWC ineligible expenditure of the Project Contract